Project Overview
Completed, August 2016 (Phase 2)

Date :

Chevron

Client :

36″ ELP II Pipeline by Horizontal Directional Drilling (HDD) Arepo – Ibafo

  • 10km of (12″ Gas Distribution Pipelines, 8″ Gas Distribution Pipelines and 4″ Gas Distribution Pipelines)
  • 5km of the various sizes of pipeline were installed by the Horizontal Directional Drilling (HDD) across built up areas and a creek.