Project Details

Home Project Details

Horizontal Directional Drilling (HDD)

 

Item

 

Client

Project Description, Type of Project,

Position in the Project Execution, Location

Year of

award of Contract

 

Status

 

1

 

ZAKHEM CONSTRUCTION NIERIA

LIMITED; 5th Floor, Zenon House, 2 Ajose Adeogun Street, Lagos. Nigeria.

LEKKI GAS PIPELINE PROJECT (LGPP):

Engineering, Procurement, Construction and Installation of 36inch (schedule 22.225) x 1.4km Gas Pipeline Across Swamp and River Using Horizontal Directional Drilling (HDD) Method at Ejinrin, Epe, Lagos State. EPC CONTRACTOR.

MAIN CLIENT – DANGOTE INDUSTRIES LIMITED.

 

2018

 

Ongoing

 

2

 

GRAMEN PETROSERVE LIMITED / CHEVRON NIGERIA LIMITED

Escravos Export System Project; Design and Installation of 30” X 540m Pipeline Section At Escravos Creek Using Horizontal Directional Drilling (HDD) Method. EPC CONTRACTOR.

 

2017

 

Completed

 

3

 

NIGERIAN PIPELINE AND STORAGE COMPANY LIMITED (NPSC)

Emergency Reconstruction Of Atlas Cove – Mosimi 16” X 1830m Pipeline Section At Ijeododo Swamp Using Horizontal Directional Drilling (HDD) Method. EPC CONTRACTOR.

 

2017

 

Completed

 

4

 

GREEN GAS LIMITED /

NIPCO PLC; CNG Project Division, 1 & 15, Dockyard Road, Apapa, Lagos State. NIGERIA

 

CONSTRUCTION, INSTALLATION AND TESTING OF 12” x 11.6km

PIPELINE (Phase – 1) and 20km x 12” Pipeline (Phase 2) including 7.6km of installation using HDD (12″ x 1.7km; 12″ x 1900m; 12″ x 1.25km; 12″ x 1700m;

12″ x 580m; 12″ x 470m) ALONG IBADAN EXPRESS WAY

 

2013

 

Completed

 

5

 

ZAKHEM CONSTRUCTION NIERIA

LIMITED; 5th Floor, Zenon House, 2 Ajose Adeogun Street, Lagos. Nigeria.

Expansion Of Escravos-Lagos Gas Pipeline Project – Phase II For The Construction, Installation And Testing Of 36inch X 10.7km Pipeline By Horizontal Directional Drilling (HDD) with 5.33km of Continous HDD Section – 2.78km; 550m and 2km sections.

 

2013

 

Completed

 

6

 

MSI AFRICA

DEVELOPMENT LIMITED;

No. 19 Mekunwen Road, Ikoyi, Lagos State. Nigeria.

Installation of 12inch x 4km Pipeline Crossing from Ango Field to Offshore Section going to Auntie Julie Platform (12″ x 1.8km Swamp Section by HDD and 12″ x 2.2 km shore approach by HDD). The line is for the provision of Hydrocarbon Evacuation Pipeline from the Ango Reservoir in OML-59 to Auntie Julie Production Facility for BELBOP NIGERIA LIMITED.

 

2013

 

Completed

 

7

PIPELINES AND PRODUCTS MARKETING COMPANY LIMITED

(PPMC); Block C, Nigerian National Petroleum Corporation (NNPC)

Towers, Abuja. Nigeria

 

Emergency Reconstruction Of Atlas Cove – Mosimi 16” X 3100m Pipeline Section At Arepo Swamp Using Horizontal Directional Drilling (HDD) Method. EPC CONTRACTOR.

 

2013

 

Completed

 

8

 

SAIPEM CONTRACTING NIGERIA LIMITED; 232A

Adeola Odeku Street, Victoria Island, Lagos. Nigeria.

HDD for Escravos River Crossing: Otumara Project: Construction Of 12” X 2.737km Pipeline To Cross The Escravos River Using The Horizontal Directional Drilling (HDD) Method for SAIPEM CONTRACTING NIGERIA

LIMITED. Main Client is SPDC. EPC CONTRACTOR.

 

2012

 

Completed

 

9

 

ZAKHEM CONSTRUCTION NIERIA

LIMITED; 5th Floor, Zenon House, 2 Ajose Adeogun Street, Lagos. Nigeria.

Expansion of Escravos-Lagos Gas Pipeline Project-Phase I. Construction, Installation and Testing of 30inch x 395m Gas Pipeline across the Benin-Warri Expressway Using the Horizontal Directional Drilling (HDD) Technology for ZAKHEM. Main Client is NIGERIAN GAS COMPANY LIMITED (NGC). EPC CONTRACTOR.

 

2011

 

Completed

 

10

 

APAPA SPM LIMITED / OANDO PLC; 2, Ajose

Adeogun Street, Victoria Island, Lagos. Nigeria.

Engineering, Procurement, Construction and Commissioning of (16”, 6” and 4” x 700m single Boundle Pull) Products Pipelines from Alakpata Facility to Marina Floating Jetty of the Phase I Apapa Oando Jetty Project : Offshore Pipeline Construction From New Jetty To Alapata Facilities Using The Horizontal Directional Drilling (Hdd) Method. EPCC CONTRACTOR.

 

2011

 

Completed

 

11

 

COMPACT MANIFOLD AND ENERGY SERVICES LIMITED (CMES); Suite

404, 4th Floor, National Engineering Centre, No. 1 Engineering Close, Off Idowu Taylor Street, Victoria Island, Lagos.

Nigeria.

Construction / Laying and Commissioning of 5 River Crossings on the 54km by 24inch Gas Transmission Pipeline from Adanga to Calabar in Cross River State (Onshore Part of the Lot3) by Horizontal Directional Drilling viz; Calabar River – 680m, Uruan River – 739m, Akwua River – 897m, Qua River – 759m and Oron River – 1862m. EPCC CONTRACTOR.

 

2011

 

Completed

 

12

 

OILSERV LIMITED; 42

Nembe Road, Rumuibekwe Estate, Port Harcourt.

Nigeria.

Construction and Installation of 12″ x 300m Gas Pipeline by Horizontal Directional Drilling across the Liverpool River for the Entire Pipeline Crossing of liverpool River for the OANDO Pipeline Works. EPC CONTRACTOR.

 

2011

 

Completed

 

13

NIGER DELTA PETROLEUM RESOURCES; 44 East

West Road, Rumuodara, Port Harcourt. Rivers State. Nigeria.

Construction and Installation of 12″ x 300m Gas Pipeline by Horizontal Directional Drilling across the Sambreiro River at Rumuji for the Ogbele-Rumuji Pipeline Project. EPC CONTRACTOR.

 

2010

 

Completed

 

14

 

OILSERV LIMITED; 42

Nembe Road, Rumuibekwe Estate, Port Harcourt.

Nigeria.

Complete Installation of 7 No River Crossings using the Horizontal Directional Drilling Method HDD on the 18inch by 130km Calabar Pipeline Project.(12″ x 1.302km; 12″ x 485m; 12″ x 472m; 12″ x 875m; 12″ x 363m;

12″ x 704m; 12″ x 760m)

 

2009

 

Completed

 

15

 

OILSERV LIMITED; 42

Nembe Road, Rumuibekwe Estate, Port Harcourt.

Nigeria.

Construction and Installation of 12″x 195m Gas Pipeline across the Coconut River in Lagos for the 12inch Gas Pipeline Construction that Stretches Out From Honeywell Tin-Can to Amuwo Odofin (Gaslink Phase II Project) Lagos State. EPC CONTRACTOR.

 

2008

 

Completed

 

16

OILSERV LIMITED; 42

Nembe Road, Rumuibekwe Estate, Port Harcourt.

Nigeria.

Installation of 18″ x 250m Iju River Crossing at the Akute Power Project Using Horizontal Directional Drilling Technology

 

2009

 

Completed

 

17

NIPCO PLC; 6 Okada

Avenue, Off Reservation Road, GRA Benin City, Edo State.

Installation of 50km x 4″, 6″ and 8″ diameter Gas Distribution Pipeline System within Benin City with over 20km of Installation done by HDD

 

2008

 

Completed

 

18

 

INTRINSIC NIGERIA

LIMITED; 50A Stadium Road, Port Harcourt. Rivers State. Nigeria.

INSTALLATION OF A 24INCH X 1.4KM GAS PIPELINE ACROSS THE NIGER RIVER AT NDONI (EPC FOR PIPELINE 24″, 18″ AND 10″ N-LNG PHASE 3 GAS SUPPLY PROJECT).

Subcontract from Intrinsic Nigeria Limited with DAEWOO/NAOC as MAIN CLIENT.

 

2003

 

Completed